|
|
Example projects
"Project that we are proud of...."
A number of example projects done by Harel Information Technologies
- GeoImage – replacing the blade servers infrastructure with a new one. In this project 128 servers were installed, which together form a High Performance Cluster
- Tehila gov.il site – consolidation of 150 servers in to a VMWare ESX environment including the primary site
- First International Bank of Israel – consolidation of 50 servers into a VMWare ESX environment. The project includes the primary site and secondary site, which replicate each other at the storage array level
- Water authority – assimilation of a storage solution based on Netapp. The project includes setup, installation, data migration from the current servers and advanced specifications
- "Derech Ertz" – replacement and upgrade of the company’s entire computer system. As a part of the project, the company’s hardware and software were updated and upgraded.
- Union Bank – upgrading the virtual environment form version x2 to the new version 3.5. The project includes a production environment of over 100 virtual servers and a full DRP backup site
- Elta and the Israel Aerospace Industry – setup and management of multiple server and storage systems in long term projects in the security field including installations abroad as part of a turn-key project
- Hapoalim Bank – implementation of a complete storage and DRP solution for a call-center including LSI storage virtualization solution and an HP EVA SAN solution
- Central Bureau of Statistics – updating the hardware at the customer site, storage and server systems, in preparation for the 2008 census
- "Mehish" - setting up a new server system and transition to a blade based solution
- "Mehish" And Mizrahi Bank – upgrading the backup system – hardware (organizational libraries), changing the backup software to TSM full integration
- Ha’Emek Hospital in Naharia – setting up a DRP system based on Xosoft software for replication between servers in multiple locations
- Arad Technologies – consolidation of 25 servers to VMWare ESX environment. The project included the primary site in Israel and a backup site in the US
- Lageen – consolidation of 10 servers to VMWare ESX environment. The project included the production environment
- Tamboor – transition to SAP servers and a storage system based on Netapp
- Administration College - expansion of the servers and central storage environment
- "Harel Hamishmar" - setting up infrastructures – SAP servers, blades, central storage, central backup system
- Avgol – upgrading the email system to Exchange 2007 while maintaining a high level of information security and setting up a high availability system in the company’s Israeli and US headquarters
- DSP – transitioning the company’s headquarters and projection to blade servers and installations in the Swiss and German offices.
- Israel Police – change the central SQL and Oracle servers from Unisys to IBM in 2 clusters of 8 processors per server
- Tel Ha’Shomer Hospital – setting up a central backup system
- The Diamond Exchange – fail-safe environment for the physical security servers
|